m8体育app网上开户

      <sub id="jftnn"></sub>

        <thead id="jftnn"></thead><sub id="jftnn"></sub>

          <thead id="jftnn"></thead>

          <sub id="jftnn"></sub>
          <address id="jftnn"></address>

                  E-Mail
                  Sitemap
                  Social Media
                  Home > Notifications
                  Notice on Temporary Road Shutdown on the Westside of No. 14 Building

                  May 4, 2018  |  BROWSE TIMES:  |  LOCATION:

                  Due to fact that the renovation of outer wall of the westside of the no. 14 residential building (Chang'an Campus) may involve clean-up of ceramic bricks, to ensure the safety of pedestrians and vehicles, the westside road of no. 14 building will be temporarily closed from May 5 to 15, 2018. Please make detour from the eastside of the building. Sorry for any inconvenience caused by the construction.


                  Department of Construction and Logistics

                      <sub id="jftnn"></sub>

                        <thead id="jftnn"></thead><sub id="jftnn"></sub>

                          <thead id="jftnn"></thead>

                          <sub id="jftnn"></sub>
                          <address id="jftnn"></address>

                                  2cm彩票

                                  tt百家乐

                                  黄金娱乐场

                                  9ovs足球既时比分

                                  快3彩票首页

                                  皇冠足球投注现金网

                                  购买游艇的网站

                                  ub8娱乐

                                  d8的彩的正确网址